api

Walton Road – Defect Repairs / Temporary Road Closure

Following concerns raised about the poor condition of the carriageway surfacing on a section of Walton Road I would like to advise, that our Highways Term Service Contractor Ringway will be carrying out temporary pot hole repairs on a section of Walton Road, the grassed verge will also be made tidy and level. We will also carry out some gulley cleaning.
Update:

Walton Road will be closed from its junction with Passalewe Lane to its junction with Phoebe Lane. Limited access to properties will be provided.

Whilst the above length of road is closed the alternative route will be via Passalewe Lane, Isaacson Drive, Groveway and Newport Road (and vice versa).

Full details are available by clicking on the following link.

Map of Diversion Route.

Closure will be on 8 and 9 March 2018 (between the hours of 9:30am and 3.30pm) the road will then be re-opened outside these hours.

Advance Information signs will be put out on 01 March 2018.

Access for Emergency Services will be provided if required.

All key stakeholders are being advised of these works and temporary road closure.

Permanent repairs will consist of resurfacing of the carriageway and reinstatement of the grassed verge this will be programmed and be carried out at a later date.

Please note that that the defect repair works are subject to no adverse weather conditions.

We will try and carry out our work with minimal disruption to the area and apologise for any inconvenience caused. If you require any further information then please do not hesitate to contact me.

Kind Regards
Diljeet Singh Bsc (Hons), MICE, MCIHT
Highways Support Engineer

This entry was posted in General information, Latest News and tagged rss. Bookmark the permalink.
forum